Our responsibilities for this project included designing, detailing, and preparing drawings and specifications for the storm water plans. In addition, our team coordinated and successfully resolved conflict issues between preexisting and proposed conditions for utilities, runway, and taxiways. We also performed all engineering work required to complete the plan design and preparation, including a formal design review, QA/QC, and Cost Estimating. |