|
 |
| Tri-Met: Washington Commuter Rail, City of Beaverton, Tigard, Tualatin, and Washington County |
| |
|
|
| |
As a sub consultant to URS for civil design support services, Alcantar’s responsibilities included:
- Designing, detailing and preparing drawings and specifications for the street crossing plans.
- Resolving conflicts between preexisting and proposed conditions for utilities, buildings, wall and trees.
- Performing all additional engineering work required to complete design and preparation of plans.
- Providing a formal design review.
- Providing drafting support.
- Performing Quality Assurance/Quality Control.
- Cost Estimating.
|
|
|
|